PT # |
Title |
Topic |
|
PT.00 |
Index to Practice Tips |
|
|
PT.01 |
When a Client Changes Architects - Different Client or Project |
|
|
PT.02 |
What Every Architectural Practice Needs to Know About Government Legislation |
|
|
PT.02.1 |
PT.02.1 Legislative Overview – Minister’s Zoning Orders (MZOs) |
|
|
PT.03 |
Building Code Data Matrices |
|
|
PT.04 |
Building Code - Project Code Review |
|
|
PT.05 |
General Review – Building Code (BC) and Non-Code Related Matters |
|
|
PT.06 |
Limitations Act, 2002 and October 19, 2006 Amendment - Don't Destroy Your Records Just Yet! |
|
|
PT.07 |
Professional Opinion - Independent Opinion - Reviewing a Project Prepared by Another CoP Holder |
|
|
PT.08 |
Participation in the Permit Process - Application for Building, Demolition or Conditional Permits |
|
|
PT.09 |
Withdrawn - Contract Administration - Goods and Services Tax |
|
|
PT.10.0 |
Construction Act / Construction Lien Act |
|
|
PT.10.1 |
Construction Lien Act – Procedures For The Release Of Statutory Lien Holdbacks |
|
|
PT.10.2 |
Construction Act – Procedures For The Release Of Statutory Lien Holdbacks |
|
|
PT.10.3 |
Construction Act – Prompt Payment |
|
|
PT.10.4 |
Construction Act – OAA Members Acting as Adjudicators |
|
|
PT.10.5 |
Construction Act – Interim Adjudication |
|
|
PT.11 |
Withdrawn - Definitions: “Design” v “Design” v “Design Activities” |
|
|
PT.12 |
Residential Clients |
|
|
PT.13 |
Use of Surveyor’s Documents |
|
|
PT.14 |
Record Drawings, As-Builts, Measured Drawings |
|
|
PT.15 |
Consulting Contracts, Managing Changes and Scope Creep |
|
|
PT.16 |
Surety Bonds - Contract Status Reports |
|
|
PT.17 |
Lending Institutions - Architect's Certificates |
|
|
PT.18 |
Pre-Qualification of Contractors |
|
|
PT.19 |
ANSI / ASHRAE / IES 90.1-2013 – An Overview of the Energy Standard |
|
|
PT.20 |
Assembly of Construction Contract Documents for Signature |
|
|
PT.21 |
Moonlighting, Employment Agreement – Employer's Liability |
|
|
PT.22 |
Employment Agreement – Employed Architects' Liability |
|
|
PT.23.1 |
Withdrawn - CCDC 2 - 2008 Stipulated Price Contract Overview of the Changes in the 2008 Version and Recommended Supplementary Conditions
|
|
|
PT.23.2 |
CCDC Construction Management Contracts |
|
|
PT.23.3 |
Withdrawn - CCDC 5A, 2010 - Construction Management Contract ‒ for Services |
|
|
PT.23.4 |
Withdrawn - CCDC 5B, 2010 - Construction Management Contract ‒ for Services and Construction |
|
|
PT.23.5 |
Withdrawn - CCDC 17, 2010 - Stipulated Price Contract Between Owner and Trade Contractor for Construction Management Projects
|
|
|
PT.23.6 |
Design-Build: CCDC 14 - 2013 |
|
|
PT.23.7 |
Design-Build: CCDC 15 - 2013 |
|
|
PT.23.11 |
CCDC 2-2020 Stipulated Price Contract Overview of the Changes in the 2020 Version and Recommended Supplementary Conditions |
|
|
PT.23.13 |
CCDC 5A, 2010 - Construction Management Contract ‒ for Services |
|
|
PT.23.14 |
CCDC 5B, 2010 - Construction Management Contract ‒ for Services and Construction |
|
|
PT.23.15 |
CCDC 17, 2010 - Stipulated Price Contract Between Owner and Trade Contractor for Construction Management Projects |
|
|
PT.24.1 |
Withdrawn - Harmonized Sales Tax – Guidelines for Administering Contracts that Span the Transition to HST on July 1, 2010 |
|
|
PT.25 |
Design-Build: Using OAA 600-2021 |
|
|
PT.26 |
Provision of Architectural Services and Construction Services – Conflict of Interest Guideline |
|
|
PT.27 |
Coordination of Consultants |
|
|
PT.28 |
Copyright Act |
|
|
PT.29 |
Lending Institutions - Assignment of Contracts |
|
|
PT.30 |
Retention of Specialist Consultants |
|
|
PT.31 |
Joint Ventures |
|
|
PT.32 |
Pro Bono Services |
|
|
PT.33 |
Fair and Reasonable Fees |
|
|
PT.34 |
Permanent Recognition of Architect Required on Buildings in the City of Toronto |
|
|
PT.35 |
OBC - Importance Category and Seismic Restraint |
|
|
PT.36.0 |
Building Energy Performance Practice Tip Series |
|
|
PT.36.1 |
Every Architect Needs to Know About Energy Modeling |
|
|
PT.36.2 |
OBC SB-10 Energy Efficiency Requirements – Prescriptive Compliance |
|
|
PT.36.3 |
OBC SB-12 Energy Efficiency Requirements – Prescriptive Compliance |
|
|
PT.37 |
Delegated Design and Shop Drawings |
|
|
PT.38 |
OBC Part 5, Environmental Separation - Durability |
|
|
PT.39.1 |
Best Practices for Review of RFP Language and Supplementary Conditions to OAA 600 and Other Architectural Services Contracts |
|
|