While Ontario’s 2024 Building Code brings much-needed updates to establish the quality, safety, and resiliency of our province’s built environment, there are numerous changes in not only in its content, but also in its format, approach, and application. It is crucial then that design/construction professionals and the authorities having jurisdiction have a clear understanding of the code and which version currently prevails for a particular project.
To this end, the Engineers, Architects, and Building Officials (EABO) joint liaison group has prepared an infographic to illustrate how some Ontario municipalities may be addressing the transition between the 2012 OBC and the 2024 version, including submission for permit under the 2012 OBC after December 31, 2024. However, some municipalities may choose to use a different methodology, so OAA members must always directly confirm with the applicable municipality before submitting for permit to avoid unnecessary delays.
Download
EABO Infographic
Last updated: 2024/Dec/05