Skip to content Skip to Navigation

Back

Toronto's Gardiner Museum Reopens After a $15.5-Million Renovation with a New Indigenous Art Gallery

A museum takes care of its collection, but the museum itself can – and must – change. Nineteen years after its last renovation, Toronto’s Gardiner Museum recently unveiled a ground-floor rebuild that reshapes 9,000 square feet of interior space for a new moment: warm, legible and welcoming to broader audiences.

The $15.5-million transformation, which plays out entirely within the museum walls, was designed by Montgomery Sisam Architects and Andrew Jones Design with Chris Cornelius of studio: indigenous.

“We landed on three main ideas for this transformation: connectivity, Indigeneity and accessibility,” museum deputy director Sequoia Miller explained last week while standing in the middle of the lobby – subtle grey porcelain tile underfoot, gentle lighting trickling down through a slatted ceiling.

Visitors who haven’t been in years might need a moment to understand the change. You enter, as before, through glass doors at one corner of the building. But after encountering an intricate installation by Nadia Myre, you can turn left and move diagonally across the entire ground floor, where two walls have been removed. A new white-oak reception desk welcomes you like an open hand. Expanses of new casework show off temporary exhibitions to the left. To the right, a redesigned gift shop and workshop line one wall.

Share
Contracts banner

OAA Contract Suite

Did you know the OAA offers free contracts for its members and the general public? These downloadable standardized contracts make it easier for all to enter into fair, balanced business relationships.

MORE
BLOAAg icon

BlOAAg

Check out the OAA BlOAAg to view our 2026 Summer Sketches series.

MORE
Events banner

Events Calendar

Check out our events calendar for a wide array of online and in-person events. Also submit an event using our online form.

MORE