Back

PT.25 Design-Build: OAA 600 - 2013

PT.25 Design-Build: OAA 600 - 2013 

References 

OAA 600–2013 with July 1, 2018 Amendments
OAA 600–2013 with Amendments to October 1, 2019 
Instructions & Commentary for OAA 600-2013 & OAA 601-2013
PT.23.6 – Design-Build: CCDC 14–2013
PT.23.7 – Design-Build: CCDC 15–2013
CCDC Contracts and Guides 
RAIC CHOP Chapter 2.3.2 Types of Project Delivery

Attachments

Sample Template–Schedule (Word)

 
 
Share: